Skip to content
Circular Solutions
Menu
  • Home
  • Projects
    • Current Projects
    • Past Projects
  • Our Team
    • About Us
    • Meet Our Members
    • Join The Team
  • Follow Us
    • Instagram
    • YouTube
  • WHAT IS CIRCULAR BIOECONOMY?
  • BLOG
  • Enterprise
  • Sponsors
Menu

What’s New?

Crew 1 – Ghost House Farm Anaerobic Digester Project

Crew 1 has begun the process for Biochemical Methane Potential (BMP) testing using the available feedstocks for Ghost House Farm’s biodigester. Through this testing the crew will have a better understanding of the methane potential for the different feedstocks to help develop a plan that works toward the goal of reducing heating costs and carbon footprint at the farm.

Crew 2 – Quincy Manufacturing Skateboard Waste Project


Currently, Crew 2 is moving towards finishing the current project and has been fine tuning the handles, weight, and overall performance of the paddles that were crafted from reclaimed maple veneer. Through the fine tuning process, Crew 2 has developed a handle design that is comfortable and overall more comparable to a standard pickleball paddle. The handles are also sourced from the same reclaimed veneer as the rest of the paddle, demonstrating how locally recovered wood can be transformed into a high-performance product while diverting material from waste streams.

For more information on Our Current projects

Current Projects

Project Highlight – The Ghost Comb

Last fall, the Circular Solutions Enterprise team had the opportunity to compete in the Biodesign Sprint, a fast-paced design challenge focused on developing innovative solutions, with this years theme for ocean futures. Our team spent the semester working with recovered fishing nets provided by a startup company, Helen of the Sea, and exploring how they could be transformed into usable 3D printing filament. From melting, griding, and extruding recycled polypropylene, to designing and prototyping our fish-shaped surf wax comb, the Ghost Comb, the experience pushed us to think creatively about how waste materials can be turned into functional, meaningful products. The sprint challenge gave us the chance to collaborate across disciplines, test recycling methods, and refine our design through hands-on experimentation.

We were honored to receive Gold Medal recognition for our project, which reflected the creativity, effort, and teamwork that went into the sprint challenge. Beyond the award itself, the Biodesign Sprint was an incredibly rewarding experience that allowed us to learn new skills, work through real engineering challenges, and present our ideas in a competitive setting. It was especially meaningful to share the project with mentors, supporters, and collaborators who helped guide us throughout the process, and it highlighted the impact that interdisciplinary teamwork and community support can have in bringing sustainable ideas to life.

For more information on the Ghost Comb project

The Ghost Comb

Come To A Meeting

Contact Us To Find Out Where

Full Team Meeting
Monday 8:00a.m.-9:00a.m.

Crew 1 Meeting – The Ghost House Farm Anaerobic Digester Project
Thursday 2:00p.m.–4:00p.m.

Crew 2 Meeting – Quincy Skateboard Manufacturing Waste Project
Wednesday 7:00p.m.–9:00p.m. 

Connect With Our Team

Contact Us

Follow Us On Social Media

  • Instagram
  • YouTube
  • Mail
© 2026 Circular Solutions | Powered by Minimalist Blog WordPress Theme